In the Actual + Forecast Construction Draw Schedule the s-curve logic is contained in the last three sections, which are color-coded grey. They are hidden by default but are grouped such that to reveal the sections simply click the plus sign at the top of column BQ. These sections are labeled ‘Initial S-Curve Ratios’, ‘Revised S-Curve Ratios’, and ‘Forecast S-Curve’.