Warm Shell

Any building/rentable area that has been minimally fitted out with basic services (such as ceilings, lighting, plumbing and HVAC) and is now ready to lease to the tenant. Usually these “warm shell improvements” – necessary to convert the building from a cold shell to a warm shell – are only completed following signature of the lease agreement in order to alleviate the Landlord paying for unnecessary improvements that the Tenant may not require. The transition from a “Cold Shell” to a “Warm Shell” is referred to as the “Build-out”.

Putting ‘Warm Shell’ in Context

Imagine a hypothetical scenario involving the Market Street Plaza, a newly retail development located in the bustling downtown area of Springfield. The development spans 45,000 square feet, designed to host a variety of tenants, including retail stores fronts and restaurants.

Market Street Plaza was initially developed as a “Cold Shell,” meaning it had the basic structure, including the exterior walls, roof, and bare concrete floors, but lacked any interior finishes or installations necessary for immediate occupancy.

A local restaurant chain, Springfield Steakhouse, expressed interest in leasing a 4,000 square foot space within this development. In line with their lease agreement, the landlord began transforming the space from a cold shell to a warm shell. This transition, commonly referred to as the “Build-out,” included the installation of dropped ceilings, commercial-grade flooring, basic plumbing for kitchen and restrooms, electrical systems with lighting, and a heating, ventilation, and air conditioning (HVAC) system suitable for restaurant use.

This build-out was strategically done post-lease signing to ensure that the improvements were specifically tailored to meet the operational needs of the tenant, thereby avoiding unnecessary costs that might not align with the tenant’s requirements. For example, the HVAC system installed was of a capacity to handle the high heat and odors from cooking, something that would not necessarily be applicable for a standard retail space setup.

Springfield Steakhouse successfully opened six months after the lease signing, offering a popular culinary experience that attracted more visitors and tenants to Market Street Plaza. This case exemplifies how warm shell improvements are pivotal in customizing a space to tenant specifications, fostering a beneficial relationship between landlord and tenant.


Click here to get this CRE Glossary in an eBook (PDF) format.